SCHEDULE 3 Paragraph 2A (b)
Subsurface works within a road reserve or easement;
Subsurface works associated with a culvert or storm water structure;
Works relating to footpaths within a road reserve or pathway reserve;
Surfacing roads, cycle ways and carparks;
Works relating to signs, lines, traffic signals and other traffic management devices (other than roundabouts, slow points and road closures) used for pedestrian and vehicle control;
Flood mitigation measures involving surface regrading and associated erosion protection and landscaping;
Playground development or improvements;
Fencing along a common boundary and behind the front building line provided the fence is less than 1.8 metres high above natural ground level;
Building a retaining wall not more than 1.2 metres high and situated at least 1.5 metres from a side or rear boundary;
Changing the external material or finish of a building provided the change would not significantly affect the appearance of the building;
Variation of the roof pitch provided the variation is not greater than 2 o ;
Installation of a chimney, flue or vent extending not more than 1.5 metres above the surface of a roof;
Resiting an approved building by not more than 150 millimetres except where the approval specified that the building be built adjacent to a boundary;
External switchboards;
External security lighting;
Minor site servicing relating to domestic connections;
Portable or demountable buildings or structures erected for a specific event or project which are to be removed at the end of a period of time;
Temporary structures;
Mobile generators;
External repainting of dwelling houses (unless subject to development conditions);
Domestic landscaping (unless subject to Appendix III.2 of the Plan);
Works relating to decks, external stairs and landings not more than 0.4 metres above natural ground level.