(1) A prime contractor commits an offence if the contractor—
(a) is engaged in the bulk transfer of dangerous goods; and
(b) fails to ensure that any hose assembly that is used, or that is intended to be used, for the transfer of the dangerous goods (other than a hose assembly for which the prime contractor is not responsible)—
(i) has been constructed, assembled and maintained in accordance with the ADG code, chapter 10.1; and
(ii) has been inspected and tested at the intervals, and in the way, required under the chapter; and
(iii) satisfies each test under the chapter.
Maximum penalty: 20 penalty units.
(2) An offence against this section is a strict liability offence.