(1) A prime contractor commits an offence if the contractor—
(a) is engaged in the bulk transfer of dangerous goods; and
(b) fails to keep, in accordance with the ADG code, section 10.1.3.4 accurate records of all maintenance work, and each inspection and test, carried out on any hose assembly that is used, or that is intended to be used, for the transfer of dangerous goods (other than a hose assembly for which the prime contractor is not responsible).
Maximum penalty: 10 penalty units.
(2) An offence against this
section is a strict liability offence.