(1) A prime contractor commits an offence if—
(a) the contractor transports dangerous goods in other packaging; and
(b) the packaging is provided by the contractor; and
(c) either—
(i) the packaging is unsuitable for the transport of the goods; or
(ii) the goods have not been packed in the packaging in accordance with the ADG code, part 4.
Maximum penalty: 40 penalty units.
(2) An offence against subsection (1) is a strict liability offence.
(3) A prime contractor commits an offence if—
(a) the contractor transports dangerous goods in other packaging; and
(b) the packaging is provided by someone else; and
(c) either—
(i) the packaging is unsuitable for the transport of the goods; or
(ii) the goods have not been packed in the packaging in accordance with the ADG code, part 4; and
(d) the contractor knows, or ought reasonably to know, that—
(i) the packaging is unsuitable for the transport of the goods; or
(ii) the goods have not been packed in the packaging in accordance with the ADG code, part 4.
Maximum penalty: 40 penalty units.