A prime contractor commits an offence if—
(a) the contractor transports dangerous goods in an overpack; and
(b) the preparation of the overpack or its contents does not comply with either—
(i) the ADG code, section 5.1.2; or
(ii) an approval under section 53 (Approvals—overpack preparation method); and
(c) the contractor knows, or ought reasonably to know, that the preparation of the overpack or its contents does not comply with—
(i) the ADG code, section 5.1.2; or
(ii) an approval under section 53.
Maximum penalty: 20 penalty units.