Australian Capital Territory Numbered Regulations
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Download]
[Related Items]
[Help]
GAS SUPPLY REGULATIONS 1999 (NO 10 OF 1999)
TABLE OF PROVISIONS
PART 1--PRELIMINARY
1. Name of regulations
2. Commencement
3. Definitions
4. When is a meter inaccurate?
5. Meter—when sealed and stamped
PART 2--GENERAL MATTERS
6. Meaning of meter
7. Prescribed amounts
8. Prescribed tests
PART 3--GASFITTING WORK
9. Qualified gasfitters to do or supervise gasfitting work
10. Work to comply with certain standards
11. Work on a consumer piping system—testing for defects
12. Connection of gas appliance—testing for defects
13. Disconnection of gas appliance—testing for leaks
14. Consumer piping system or gas appliance unsafe
15. Consumer piping system or gas appliance safe
16. Consumer piping system or gas appliance not to be used unless certified safe
17. Certificates of compliance to be kept
18. Certificates of compliance and compliance plates
19. Damage etc to, and recording of information on, compliance plates
20. Regulator may direct testing of consumer piping system
PART 4--TESTING OF METERS AND METER TESTING EQUIPMENT
21. Minimum testing procedures
22. Regulator to approve testing procedures
23. Only authorised persons to test etc meters
24. Supply or installation of meters
25. Meters to be tested on application
26. Regulator may test meters
27. When owner must have meters retested
28. Off-site testing
29. Persons who may witness testing of meters
30. Certificates of the outcome of tests by or arranged by regulator
31. Inaccurate meters
32. Replacement program for meters
33. Meter testing equipment to be tested and calibrated
PART 5--SAFETY AND OPERATING PLANS
34. Matters to be included in safety and operating plans
35. Exemption from requirements of safety and operating plan
36. Gas pipeline operator to lodge and implement proposed safety and operating plan
37. Proposed plan to be audited by safety auditor
38. Approval of proposed plan
39. Regulator may direct amendment of proposed plan
40. Application of this Division to new plans or revised plans
41. Gas pipeline operator may lodge new safety and operating plan or part of a plan
42. Regulator may approve draft variation of approved plan
43. Regulator may direct revision of an approved plan
44. Nomination of safety auditor
45. Periodical audits of safety and operating plans
46. Availability of safety and operating plans
47. Regulator may direct compliance with plans
PART 6--MISCELLANEOUS
48. Authorisations to test meters and meter testing equipment
49. Review of regulator's decisions
SCHEDULE 1
SCHEDULE 2
AustLII: Copyright Policy
| Disclaimers
| Privacy Policy
| Feedback