(1) Within 6 months after the commencement of this section, the Commission must:
(a) prepare a written plan setting out:
(i) an outline of the Commission's proposals for making Procedural Rules; and
(ii) an indicative timetable for making those Procedural Rules; and
(b) make a copy of the plan available on the Commission's website.
(2) A failure to comply with the plan does not affect the validity of an instrument under subsection 152ELA(1).
(3) The plan is not a legislative instrument.