Compilation No. 31
Compilation date: 14 October 2024
Includes amendments: Act No. 39, 2024
About this compilation
This compilation
This is a compilation of the Renewable Energy (Electricity) Act 2000 that shows the text of the law as amended and in force on 14 October 2024 (the compilation date).
The notes at the end of this compilation (the endnotes) include information about amending laws and the amendment history of provisions of the compiled law.
Uncommenced amendments
The effect of uncommenced amendments is not shown in the text of the compiled law. Any uncommenced amendments affecting the law are accessible on the Register (www.legislation.gov.au). The details of amendments made up to, but not commenced at, the compilation date are underlined in the endnotes. For more information on any uncommenced amendments, see the Register for the compiled law.
Application, saving and transitional provisions for provisions and amendments
If the operation of a provision or amendment of the compiled law is affected by an application, saving or transitional provision that is not included in this compilation, details are included in the endnotes.
Editorial changes
For more information about any editorial changes made in this compilation, see the endnotes.
Modifications
If the compiled law is modified by another law, the compiled law operates as modified but the modification does not amend the text of the law. Accordingly, this compilation does not show the text of the compiled law as modified. For more information on any modifications, see the Register for the compiled law.
Self-repealing provisions
If a provision of the compiled law has been repealed in accordance with a provision of the law, details are included in the endnotes.
Contents
Part 1--Preliminary
1 Short title
2 Commencement
3 Object/outline
4 Years to which this Act applies
6 Act binds Crown
7 Application to the external Territories
7A Tax deductibility
7B Constitutional basis
7C Immunity from State laws
Part 2--Renewable energy certificates
Division 1--Preliminary
8 Overview of Part
Division 2--Registration of persons
9 Who can register
10 Applying for registration
11 Regulator to refuse or approve application
12 Regulator to allocate registration numbers
Division 2A--Provisional accreditation of power stations
12A Application for provisional accreditation of a power station
12B Regulator may give provisional accreditation
12C Time limit for deciding applications
Division 3--Accreditation of eligible power stations
13 Application for accreditation
14 Regulator to determine certain matters
15 Regulator to approve or refuse application
15A Time limit for deciding applications
15B Nominated person for power station
16 Regulator to allocate identification codes
17 What is an eligible renewable energy source?
17A What is eligible WCMG?
Division 4--Creation of renewable energy certificates
Subdivision AA--Preliminary
17B Overview of Division
Subdivision A--Large-scale generation certificates for accredited power stations
17C Large-scale generation certificates
18 Creating certificates for additional renewable electricity
19 When certificates may be created
20 Electricity generation return
20A Amending electricity generation returns
Subdivision B--Small-scale technology certificates for solar water heaters
20B Small-scale technology certificates
21 When a certificate may be created
22 How many certificates may be created
23 Who may create a certificate
23AA Register of solar water heaters
Subdivision BA--Small-scale technology certificates for small generation units
23AB Small-scale technology certificates
23A When a certificate may be created
23AAA Regulations to establish scheme for inspection of new installations of small generation units
23B How many certificates may be created
23C Who may create a certificate
23D No other certificates to be created
23E Election to not create certificates under this Subdivision
Subdivision BB--Solar water heater and small generation unit return
23F Solar water heater and small generation unit return
Subdivision C--Improper creation of certificates
24 Improper creation of certificates--offences
24A Improper creation of certificates--civil penalty
24B False etc. information resulting in improper creation of certificates under Subdivision B or BA--civil penalty
Division 5--Form and registration of certificates
25 Form and content of large-scale generation certificates
25A Form and content of small-scale technology certificates
26 Certificates must be registered
Division 6--Transfer of certificates
27 Certificates may be transferred
28 Regulator to be notified
Division 7--Retirement of certificates
28A Registered owner may surrender certificate
29 Retirement of certificates
Division 8--Suspension of registration
30 Suspension of registration--conviction of offence
30A Suspension of registration--other grounds
Division 9--Changing the nominated person for an accredited power station
30B Changing the nominated person for an accredited power station
Division 10--Varying what constitutes a power station
30C Varying what constitutes a power station
Division 11--Suspending the accreditation of a power station
30D Suspending the accreditation of a power station--interconnected power stations
30E Suspending the accreditation of a power station--other grounds
Division 12--Varying 1997 eligible renewable power baselines and 2008 WCMG limits
30F Varying 1997 eligible renewable power baselines
30G Varying 2008 WCMG limits
Part 2A--Clearing house for small-scale technology certificates
Division 1--Preliminary
30H Overview of Part
Division 2--Regulator to establish and operate clearing house
30J Regulator to establish and operate clearing house
Division 3--Entering certificates into the clearing house
30K Application for certificate to be entered into the clearing house
30L Regulator to enter certificate into the clearing house
Division 4--Purchase of certificates through the clearing house
30LA Clearing house price etc.
30M Application for purchase of certificate through the clearing house
30N If there is a certificate on the clearing house transfer list--Regulator to transfer certificate
30P If there is no certificate on the clearing house transfer list--Regulator to create certificate
30Q Form and content of certificates created by the Regulator
Division 5--Renewable Energy Special Account
30R Renewable Energy Special Account
30S Credits to the Renewable Energy Special Account
30T Purposes of the Renewable Energy Special Account
Division 6--Other matters
30U Regulations about the operation of the clearing house
Part 3--Acquisition of electricity
31 What are relevant acquisitions?
32 Wholesale acquisitions
33 Notional wholesale acquisitions
34 Special provision relating to transactions involving AEMO or a person or body prescribed by the regulations
Part 4--Renewable energy shortfall charge
Division 1AA--Preliminary
34A Overview of Part
Division 1--Liability to charge
Subdivision A--Liable entities
35 Liable entities
Subdivision B--Large-scale generation shortfall charge
36 Large-scale generation shortfall charge payable by liable entity
37 Amount of charge
38 Determination of large-scale generation shortfall
Subdivision C--Small-scale technology shortfall charge
38AA Interpretive provisions relating to liability for small-scale technology shortfall charge etc.
38AB Small-scale technology shortfall charge payable by liable entity
38AC Amount of charge
38AD Determination of small-scale technology shortfall
38AE Quarterly shortfalls for the quarters of a year
38AF Energy acquisition statement lodged for previous year: application to have amount apply instead of previous year's reduced acquisitions
38AG No energy acquisition statement lodged for previous year: application to have amount apply as if it were previous year's reduced acquisitions
38AH No energy acquisition statement lodged for previous year: default rule
38AI General provisions relating to applications under sections 38AF and 38AG
Division 1A--Exemption from liability to charge
38A Object
38B Amount of exemption
38C Information about exemptions to be published on Regulator's website
Division 2--Renewable power percentage for large-scale generation shortfall charge
39 Regulations to specify renewable power percentage
40 Required GWh of renewable source electricity
Division 2A--Small-scale technology percentage for small-scale technology shortfall charge
40A Regulations to specify small-scale technology percentage
Division 2AA--Emerging renewable energy technologies
40AB Inclusion of emerging renewable energy technologies
Division 3--Other provisions related to renewable energy shortfall charge
40B Regulator to publish estimate of small-scale technology percentage
40C Regulator to give liable entity estimate of current year's required surrender amounts for first 3 quarters
41 Arrangements to avoid or reduce renewable energy shortfall charge
42 Application of Act to Commonwealth
43 Cancellation of exemptions from charges
Part 5--Statements, certificates and assessments
Division 1AA--Preliminary
43A Overview of Part
Division 1--Statements
Subdivision A--Annual energy acquisition statements
44 Annual energy acquisition statements
44A Surrender of large-scale generation certificates in energy acquisition statement
45 Surrender of small-scale technology certificates in quarterly surrender instrument
45A Amending energy acquisition statement at request of liable entity
45B Amending energy acquisition statement on Regulator's own initiative
45C Surrender of additional certificates if energy acquisition statement amended on Regulator's own initiative
45D Limitations on certificates that can be surrendered under this Subdivision
45E Fees for surrender of certificates under this Subdivision
Subdivision B--Annual renewable energy shortfall statements
46 Annual renewable energy shortfall statements
Division 1A--Exemption certificates
46A Application for exemption certificate
46B Exemption certificates
46C Amending exemption certificates
46D Minister may obtain information from corporation
46E No exemption certificates to be issued to corporation for 5 years if Minister's request not complied with
46F Disclosure of information to the Regulator
Division 2--Assessments
Subdivision A--Large-scale generation shortfall charge
47 First large-scale generation shortfall statement taken to be assessment of large-scale generation shortfall charge
48 Default assessments of large-scale generation shortfall charge
Subdivision B--Small-scale technology shortfall charge
48A First small-scale technology shortfall statement taken to be assessment of small -scale shortfall charge
48B Default assessments of small-scale technology shortfall charge
Subdivision C--Other provisions relating to assessments
49 Amendment of assessments
50 Refund of overpaid amounts
51 Amended assessment to be an assessment
52 Notice of assessment
53 Validity of assessment
53A Application of Division
Part 6--Objections, reviews and appeals
Division 1--Objections to and review of assessments
54 Objections
55 How objections are to be made
56 Limited objection rights in the case of certain amended assessments
57 Requests for extension of time
58 Regulator to decide objections
59 Person may require Regulator to make an objection decision
60 Liable entity may seek review of, or appeal against, Regulator's decision
61 Grounds of objection and burden of proof
62 Time limit for appeals
63 Order of Federal Court on objection decision
64 Implementation of Federal Court order in respect of objection decision
65 Pending appeal not to affect implementation of decisions
Division 2--Review of other decisions
66 Review of decisions
Part 7--Collection and recovery of charge
Division 1--General rules about collection and recovery
67 When renewable energy shortfall charge is payable
68 When penalty charge becomes due and payable
69 Extension of time for payment
70 Penalty for unpaid renewable energy shortfall charge or unpaid penalty charge
71 Recovery of renewable energy shortfall charge related liability
72 Service of documents if a person is absent from Australia or cannot be found
Division 2--Special rules about collection and recovery
Subdivision A--Recovery from a third party
73 Regulator may collect amounts from third party
74 Notice to Commonwealth, State or Territory
75 Indemnity
76 Offence
Subdivision B--Recovery from liquidator
77 Liquidator's obligation
78 Offence
79 Joint liability of 2 or more liquidators
80 Liquidator's other obligation or liability
Subdivision C--Recovery from receiver
81 Receiver's obligation
82 Offence
83 Joint liability of 2 or more receivers
84 Receiver's other obligation or liability
Subdivision D--Recovery from agent winding up business for non-resident principal
85 Obligation of agent winding up business for non-resident principal
86 Offence
87 Joint liability of 2 or more agents
88 Agent's other obligation or liability
Subdivision E--Recovery from deceased person's estate
89 Administered estate
90 Unadministered estate
Division 3--Other matters
91 What this Division is about
92 Right of recovery if another person is liable
93 Right of contribution if persons are jointly liable
94 Regulator may authorise amount to be recovered
Part 8--Refunding large-scale generation shortfall charge
95 Refunding large-scale generation shortfall charge in later years
96 Value of certificates surrendered
97 Certificates can only be surrendered if there is no shortfall
98 Refund of charge where certificates surrendered
Part 9--Penalty charge
99 Penalty charge for failure to provide statements or information relevant to large-scale generation shortfall charge
99A Penalty charge for failure to provide statements or information relevant to small-scale technology shortfall charge
100 False or misleading statements
101 Penalty charge where arrangement to avoid renewable energy shortfall charge
102 Assessment of penalty charge
103 Remitting penalty charge
Part 10--Administration
104 General administration of Act
105 Annual report
Part 11--Audit
Division 1--Overview
106 Overview of Part
Division 2--Appointment of authorised officers and identity cards
107 Appointment of authorised officers
108 Identity cards
109 Offences related to identity cards
Division 3--Powers of authorised officer
Subdivision A--Monitoring powers
110 Entry to premises
111 Monitoring powers of authorised officers
Subdivision B--Power of authorised officer to ask questions and seek production in certain circumstances
112 Authorised officer may request or require persons to answer questions etc.
113 Failure to provide information to authorised officer
Division 4--Obligations and incidental powers of authorised officers
116 Authorised officer must produce identity card on request
117 Consent
118 Announcement before entry
119 Details of monitoring warrant to be given to occupier etc. before entry
120 Use of electronic equipment in exercising monitoring powers
121 Compensation for damage to electronic equipment
Division 5--Occupier's rights and responsibilities
122 Occupier entitled to be present during execution of monitoring warrant
123 Occupier to provide authorised officer with all facilities and assistance
124 Offences related to warrants
Division 6--Warrants
125 Monitoring warrants
Part 11A--Information-gathering powers
125A Regulator may obtain information and documents
125B Self-incrimination
125C Copies of documents
125D Regulator may retain documents
125E False or misleading evidence
Part 12--Publication of information
134 Regulator may publish certain information
Part 13--Registers
Division 1--General
135 Registers to be maintained
Division 2--The register of registered persons
136 Contents of register of registered persons
137 Form of register
Division 3--The register of accredited power stations
138 Contents of register of accredited power stations
139 Form of register
Division 4--The register of large-scale generation certificates
140 Contents of register of large-scale generation certificates
141 Form of register
Division 4A--The register of small-scale technology certificates
141AA Contents of register of small-scale technology certificates
141AB Form of register
Division 5--The register of applications for accredited power stations
141A Contents of register of applications for accredited power stations
141B Form of register
Part 15--Offences for failure to provide documents
154 Failure to provide documents
Part 15A--Civil penalties
Division 1--Civil penalty orders
154A Definitions
154B Civil penalty orders
154C Who may apply for a civil penalty order
154D Two or more proceedings may be heard together
154E Time limit for application for an order
154F Civil evidence and procedure rules for civil penalty orders
154G Civil proceedings after criminal proceedings
154H Criminal proceedings during civil proceedings
154J Criminal proceedings after civil proceedings
154K Evidence given in proceedings for a civil penalty order not admissible in criminal proceedings
154L Mistake of fact
154M State of mind
Division 2--Liability of executive officers of bodies corporate
154N Civil penalties for executive officers of bodies corporate
154P Reasonable steps to prevent contravention
Part 15B--Other remedies
Division 1--Enforceable undertakings
154Q Acceptance of undertakings
154R Enforcement of undertakings
Division 2--Injunctions
154S Injunctions
Part 16--Miscellaneous
155 Contracting outsiders
156 Delegation
157 Appropriation
159 Evidence
160 Records to be kept and preserved by registered persons, liable entities and holders of exemption certificates
160A Prescribing matters by reference to other instruments
160B Administrative decisions under the regulations
161 Regulations
Part 17--Application of Act to 2001
163 Object of Part
164 Modification of references to a year
165 Modification of other references
Endnotes
Endnote 1--About the endnotes
Endnote 2--Abbreviation key
Endnote 3--Legislation history
Endnote 4--Amendment history
The endnotes provide information about this compilation and the compiled law.
The following endnotes are included in every compilation:
Endnote 1--About the endnotes
Endnote 2--Abbreviation key
Endnote 3--Legislation history
Endnote 4--Amendment history
Abbreviation key--Endnote 2
The abbreviation key sets out abbreviations that may be used in the endnotes.
Legislation history and amendment history--Endnotes 3 and 4
Amending laws are annotated in the legislation history and amendment history.
The legislation history in endnote 3 provides information about each law that has amended (or will amend) the compiled law. The information includes commencement details for amending laws and details of any application, saving or transitional provisions that are not included in this compilation.
The amendment history in endnote 4 provides information about amendments at the provision (generally section or equivalent) level. It also includes information about any provision of the compiled law that has been repealed in accordance with a provision of the law.
Editorial changes
The Legislation Act 2003 authorises First Parliamentary Counsel to make editorial and presentational changes to a compiled law in preparing a compilation of the law for registration. The changes must not change the effect of the law. Editorial changes take effect from the compilation registration date.
If the compilation includes editorial changes, the endnotes include a brief outline of the changes in general terms. Full details of any changes can be obtained from the Office of Parliamentary Counsel.
Misdescribed amendments
A misdescribed amendment is an amendment that does not accurately describe how an amendment is to be made. If, despite the misdescription, the amendment can be given effect as intended, then the misdescribed amendment can be incorporated through an editorial change made under section 15V of the Legislation Act 2003.
If a misdescribed amendment cannot be given effect as intended, the amendment is not incorporated and "(md not incorp)" is added to the amendment history.
ad = added or inserted | o = order(s) |
am = amended | Ord = Ordinance |
amdt = amendment | orig = original |
c = clause(s) | par = paragraph(s)/subparagraph(s) |
C[x] = Compilation No. x | /sub-subparagraph(s) |
Ch = Chapter(s) | pres = present |
def = definition(s) | prev = previous |
Dict = Dictionary | (prev ... ) = previously |
disallowed = disallowed by Parliament | Pt = Part(s) |
Div = Division(s) | r = regulation(s)/rule(s) |
ed = editorial change | reloc = relocated |
exp = expires/expired or ceases/ceased to have | renum = renumbered |
effect | rep = repealed |
F = Federal Register of Legislation | rs = repealed and substituted |
gaz = gazette | s = section(s)/subsection(s) |
LA = Legislation Act 2003 | Sch = Schedule(s) |
Sdiv = Subdivision(s) | |
(md) = misdescribed amendment can be given | SLI = Select Legislative Instrument |
effect | SR = Statutory Rules |
(md not incorp) = misdescribed amendment | Sub-Ch = Sub-Chapter(s) |
cannot be given effect | SubPt = Subpart(s) |
mod = modified/modification | underlining = whole or part not |
No. = Number(s) | commenced or to be commenced |
Endnote 3--Legislation history
Act | Number and year | Assent | Commencement | Application, saving and transitional provisions |
174, 2000 | 21 Dec 2000 | 18 Jan 2001 (s 2) |
| |
90, 2006 | 30 June 2006 | Sch 1: 11 Sept 2006 (s 2(1) item 2) | Sch 1 (items 193-207) | |
26, 2008 | 23 June 2008 | Sch 1 (items 109-112): 23 June 2008 (s 2(1) item 4) | -- | |
73, 2008 | 3 July 2008 | Sch 1 (items 41-45): 18 Jan 2001 (s 2(1) item 29) | -- | |
Australian Energy Market Amendment (AEMO and Other Measures) Act 2009 | 17, 2009 | 26 Mar 2009 | Sch 1 (items 7-11): 1 July 2009 | -- |
78, 2009 | 7 Sept 2009 | Sch 3 (items 1, 2): 1 July 2011 (s 2 (1) item 4) | Sch 1 (item 7), Sch 2 (item 22) and Sch 3 (items 3-9) | |
8, 2010 | 1 Mar 2010 | Sch 5 (item 137(a)): 1 Mar 2010 (s 2(1) items 31, 38) | -- | |
69, 2010 | 28 June 2010 | Sch 1 (items 1-99): 1 Jan 2011 (s 2(1) item 2) | Sch 2 | |
as amended by |
|
|
|
|
136, 2012 | 22 Sept 2012 | Sch 2 (item 32): 1 Jan 2011 (s 2(1) item 24) | -- | |
46, 2011 | 27 June 2011 | Sch 2 (items 987-990) and Sch 3 (items 10, 11): 27 Dec 2011 (s 2(1) items 7, 12) | Sch 3 (items 10, 11) | |
Superannuation Legislation (Consequential Amendments and Transitional Provisions) Act 2011 | 58, 2011 | 28 June 2011 | Sch 1 (items 154-157): 1 July 2011 (s 2(1) item 2) | -- |
89, 2011 | 4 Aug 2011 | Sch 5: 4 Aug 2011 (s 2(1) item 5) | Sch 5 (item 2) | |
132, 2011 | 18 Nov 2011 | Sch 1 (items 195-212, 215, 220, 221): 2 Apr 2012 (s 2(1) item 2) | Sch 1 (items 215, 220, 221) and Sch 3 (item 6) | |
as amended by |
|
|
|
|
14, 2023 | 11 Apr 2023 | Sch 3 (item 1): 12 Apr 2023 (s 2(1) item 2) | -- | |
Federal Circuit Court of Australia (Consequential Amendments) Act 2013 | 13, 2013 | 14 Mar 2013 | Sch 1 (items 496, 497): 12 Apr 2013 (s 2(1) item 2) | -- |
Statute Law Revision Act (No. 1) 2014 | 31, 2014 | 27 May 2014 | Sch 8 (item 38): 24 June 2014 (s 2(1) item 10) | -- |
Public Governance and Resources Legislation Amendment Act (No. 1) 2015 | 36, 2015 | 13 Apr 2015 | Sch 5 (items 53-59, 74-77) and Sch 7: 14 Apr 2015 (s 2) | Sch 5 (items 74-77) and Sch 7 |
as amended by |
|
|
|
|
Acts and Instruments (Framework Reform) (Consequential Provisions) Act 2015 | 126, 2015 | 10 Sept 2015 | Sch 1 (item 486): 5 Mar 2016 (s 2(1) item 2) | -- |
90, 2015 | 27 June 2015 | Sch 1 (items 1-39, 46): 27 June 2015 (s 2(1) item 1) | Sch 1 (items 37, 38, 46) | |
Acts and Instruments (Framework Reform) (Consequential Provisions) Act 2015 | 126, 2015 | 10 Sept 2015 | Sch 1 (items 504, 505): 5 Mar 2016 (s 2(1) item 2) | -- |
Statute Law Revision Act (No. 1) 2016 | 4, 2016 | 11 Feb 2016 | Sch 4 (items 1, 263-267): 10 Mar 2016 (s 2(1) item 6) | -- |
41, 2018 | 22 May 2018 | Sch 1 (items 4-6): 19 June 2018 (s 2(1) item 2) | -- | |
National Security Legislation Amendment (Espionage and Foreign Interference) Act 2018 | 67, 2018 | 29 June 2018 | Sch 2 (item 31): 29 Dec 2018 (s 2(1) item 3) | -- |
13, 2021 | 1 Mar 2021 | Sch 2 (items 722, 723): 1 Sept 2021 (s 2(1) item 5) | -- | |
38, 2022 | 13 Sept 2022 | Sch 1 (items 55, 56): 14 Sept 2022 (s 2(1) item 1) | -- | |
Statute Law Amendment (Prescribed Forms and Other Updates) Act 2023 | 74, 2023 | 20 Mar 2024 | Sch 1 (items 122, 123): 20 Mar 2024 (s 2(1) item 2) | Sch 1 (item 123) |
Administrative Review Tribunal (Consequential and Transitional Provisions No. 2) Act 2024 | 39, 2024 | 31 May 2024 | Sch 3 (items 48-53): 14 Oct 2024 (s 2(1) item 2) | -- |
Primary Industries (Consequential Amendments and Transitional Provisions) Act 2024 | 60, 2024 | 9 July 2024 | Sch 2 (item 89): 1 Jan 2025 (s 2(1) item 3) | -- |
Provision affected | How affected |
Part 1 |
|
s 3..................... | am No 90, 2006; No 78, 2009; No 90, 2015; No 38, 2022 |
s. 4..................... | am. No. 78, 2009 |
s 5..................... | am No 90, 2006; No 17, 2009; No 78, 2009; No 69, 2010; No 46, 2011; No 58, 2011; No 132, 2011; No 13, 2013; No 36, 2015; No 90, 2015; No 13, 2021; No 38, 2022; No 60, 2024 |
s. 6..................... | am. No. 69, 2010 |
s 7B.................... | ad No 78, 2009 |
s 7C.................... | ad No 78, 2009 |
Part 2 |
|
Division 1 |
|
s. 8..................... | am. No. 90, 2006; No. 78, 2009; No. 69, 2010 (as am. by No. 136, 2012) |
Division 2 |
|
Division 2 heading.......... | rs. No. 90, 2006 |
s. 9..................... | am. No. 90, 2006 |
s. 11.................... | rs. No. 132, 2011 |
Division 2A |
|
Division 2A............... | ad. No. 90, 2006 |
s. 12A................... | ad. No. 90, 2006 |
| am. No. 78, 2009 |
s 12B................... | ad No 90, 2006 |
s 12C................... | ad No 90, 2006 |
Division 3 |
|
s. 13.................... | am. No. 90, 2006; No. 78, 2009; No. 69, 2010 |
s. 14.................... | am. No. 90, 2006; No. 78, 2009 |
s. 15.................... | am. No. 90, 2006 |
s. 15A................... | ad. No. 90, 2006 |
| am. No. 78, 2009; No. 69, 2010 |
s. 15B................... | ad. No. 90, 2006 |
s. 17.................... | rs. No. 90, 2006 |
s. 17A................... | ad. No. 78, 2009 |
| am. No. 69, 2010 |
Division 4 |
|
Division 4 heading.......... | rs. No. 69, 2010 |
Subdivision AA |
|
Subdivision AA............ | ad. No. 69, 2010 |
s 17B................... | ad No 69, 2010 |
| ed C29 |
Subdivision A |
|
Subdivision A heading........ | rs. No. 69, 2010 |
s. 17C................... | ad. No. 69, 2010 |
s. 18.................... | am. No. 90, 2006; No. 78, 2009 |
s. 19.................... | rs. No. 90, 2006 |
| am. No. 69, 2010 |
s. 20.................... | am. No. 90, 2006; No. 78, 2009 |
s. 20A................... | ad. No. 90, 2006 |
Subdivision B |
|
Subdivision B heading........ | rs. No. 69, 2010 |
s. 20B................... | ad. No. 69, 2010 |
s. 21.................... | am. No. 90, 2006; No. 69, 2010 |
s. 22.................... | am. No. 90, 2006; No. 69, 2010 |
s. 23AA................. | ad. No. 90, 2006 |
Subdivision BA |
|
Subdivision BA heading....... | rs. No. 69, 2010 |
s. 23AB.................. | ad. No. 69, 2010 |
s. 23A................... | am. No. 90, 2006; No. 69, 2010 |
s. 23AAA................ | ad. No. 69, 2010 |
| am. No. 132, 2011 |
s. 23B................... | am. No. 90, 2006; No. 78, 2009; No. 69, 2010 |
am. No. 90, 2006 | |
s. 23E................... | ad. No. 90, 2006 |
Subdivision BB |
|
Subdivision BB............ | ad. No. 90, 2006 |
s. 23F................... | ad. No. 90, 2006 |
Subdivision C |
|
s 24.................... | am No 90, 2006; No 4, 2016; No 41, 2018 |
ad. No. 69, 2010 | |
Division 5 |
|
s. 25.................... | am. No. 90, 2006; No. 78, 2009; No. 69, 2010 |
s. 25A................... | ad. No. 90, 2006 |
| am. No. 78, 2009; No. 69, 2010 |
s. 26.................... | am. No. 69, 2010; No. 132, 2011 |
Division 6 |
|
s. 27.................... | am. No. 69, 2010 |
s. 28.................... | am. No. 69, 2010 |
Division 7 |
|
s. 28A................... | ad. No. 90, 2006 |
| am. No. 69, 2010 |
s. 29.................... | am. No. 90, 2006; No. 69, 2010 |
Division 8 |
|
s. 30.................... | am. No. 90, 2006 |
s. 30A................... | ad. No. 90, 2006 |
| am. No. 69, 2010; No. 132, 2011 |
Division 9 |
|
Division 9................ | ad. No. 90, 2006 |
s. 30B................... | ad. No. 90, 2006 |
Division 10 |
|
Division 10............... | ad. No. 90, 2006 |
s. 30C................... | ad. No. 90, 2006 |
Division 11 |
|
Division 11............... | ad. No. 90, 2006 |
s. 30D................... | ad. No. 90, 2006 |
| am. No. 78, 2009; No. 69, 2010; No. 132, 2011 |
s. 30E................... | ad. No. 90, 2006 |
Division 12 |
|
Division 12 heading.......... | rs. No. 78, 2009 |
Division 12............... | ad. No. 90, 2006 |
s. 30F................... | ad. No. 90, 2006 |
s. 30G................... | ad. No. 78, 2009 |
Part 2A |
|
Part 2A.................. | ad. No. 69, 2010 |
Division 1 |
|
s. 30H................... | ad. No. 69, 2010 |
Division 2 |
|
s. 30J................... | ad. No. 69, 2010 |
Division 3 |
|
ad. No. 69, 2010 | |
Division 4 |
|
s. 30LA.................. | ad. No. 69, 2010 |
| am No 126, 2015 |
ad. No. 69, 2010 | |
ad. No. 69, 2010 | |
Division 5 |
|
s 30R................... | ad No 69, 2010 |
| am No 36, 2015 |
s 30S................... | ad No 69, 2010 |
| am No 36, 2015 |
s 30T................... | ad No 69, 2010 |
| am No 36, 2015 |
Division 6 |
|
s. 30U................... | ad. No. 69, 2010 |
Part 3 |
|
am. No. 90, 2006; No. 17, 2009 | |
s. 33.................... | am. No. 90, 2006 |
s. 34.................... | am. No. 90, 2006; No. 17, 2009 |
Part 4 |
|
Division 1AA |
|
Division 1AA.............. | ad. No. 69, 2010 |
s. 34A................... | ad. No. 69, 2010 |
| am No 90, 2015 |
Division 1 |
|
Subdivision A |
|
Subdivision A heading........ | ad. No. 69, 2010 |
Subdivision B |
|
Subdivision B.............. | ad. No. 69, 2010 |
rs. No. 69, 2010 | |
s. 38.................... | am. No. 90, 2006; No. 78, 2009 |
| rs. No. 69, 2010 |
| am No 90, 2015 |
Subdivision C |
|
Subdivision C.............. | ad. No. 69, 2010 |
s 38AA.................. | ad. No. 69, 2010 |
| am No 90, 2015 |
s 38AB.................. | ad. No. 69, 2010 |
s 38AC.................. | ad. No. 69, 2010 |
s 38AD.................. | ad. No. 69, 2010 |
s 38AE.................. | ad. No. 69, 2010 |
s 38AF.................. | ad. No. 69, 2010 |
s 38AG.................. | ad. No. 69, 2010 |
s 38AH.................. | ad. No. 69, 2010 |
s 38AI................... | ad. No. 69, 2010 |
Division 1A |
|
Division 1A heading......... | rs No 90, 2015 |
Division 1A............... | ad No 78, 2009 |
s. 38A................... | ad. No. 78, 2009 |
| am. No. 69, 2010 |
| rs No 90, 2015 |
s 38B................... | ad. No. 78, 2009 |
| rs No 90, 2015 |
s 38C................... | ad. No. 78, 2009 |
| am No 90, 2015 |
Division 2 |
|
Division 2 heading.......... | rs. No. 69, 2010 |
s 39.................... | am. No. 90, 2006; No. 78, 2009; No. 69, 2010; No 90, 2015 |
s 40.................... | am. No. 90, 2006; No. 78, 2009; No. 69, 2010; No 90, 2015 |
Division 2A |
|
Division 2A............... | ad. No. 69, 2010 |
s. 40A................... | ad. No. 69, 2010 |
| am No 90, 2015 |
Division 2AA |
|
Division 2AA.............. | ad. No. 69, 2010 |
s. 40AB.................. | ad. No. 69, 2010 |
Division 3 |
|
Division 3 heading.......... | rs. No. 69, 2010 |
ad. No. 69, 2010 | |
s. 41.................... | am. No. 90, 2006; No. 69, 2010 |
s 42.................... | am No 90, 2006; No 36, 2015 |
Part 5 |
|
Part 5 heading............. | rs. No. 78, 2009 |
Division 1AA |
|
Division 1AA.............. | ad. No. 69, 2010 |
s. 43A................... | ad. No. 69, 2010 |
| am No 90, 2015 |
Division 1 |
|
Division 1................ | rs. No. 69, 2010 |
Subdivision A |
|
s. 44.................... | am. No. 90, 2006; No. 78, 2009 |
| rs. No. 69, 2010 |
| am No 90, 2015 |
s. 44A................... | ad. No. 69, 2010 |
s. 45.................... | am. No. 90, 2006 |
| rs. No. 69, 2010 |
s. 45A................... | ad. No. 90, 2006 |
| rs. No. 69, 2010 |
ad. No. 69, 2010 | |
Subdivision B |
|
s. 46.................... | am. No. 90, 2006 |
| rs. No. 69, 2010 |
Division 1A |
|
Division 1A heading......... | rs No 90, 2015 |
Division 1A............... | ad. No. 78, 2009 |
s 46A................... | ad. No. 78, 2009 |
| am. No. 69, 2010; No 90, 2015 |
s 46B................... | ad. No. 78, 2009 |
| am. No. 69, 2010; No 90, 2015 |
s. 46C................... | ad. No. 78, 2009 |
| am. No. 69, 2010; No 90, 2015 |
s 46D................... | ad. No. 69, 2010 |
| am No 90, 2015 |
s 46E................... | ad. No. 69, 2010 |
| am No 90, 2015 |
s 46F................... | ad. No. 69, 2010 |
Division 2 |
|
Subdivision A |
|
Subdivision A............. | ad. No. 69, 2010 |
s 47.................... | am No 90, 2006 |
| rs No 69, 2010 |
s 48.................... | am No 90, 2006 |
| rs No 69, 2010 |
Subdivision B |
|
Subdivision B.............. | ad. No. 69, 2010 |
s 48A................... | ad No 69, 2010 |
s 48B................... | ad No 69, 2010 |
Subdivision C |
|
Subdivision C heading........ | ad. No. 69, 2010 |
s. 49.................... | am. No. 90, 2006 |
s. 50.................... | am. No. 90, 2006 |
s. 52.................... | am. No. 90, 2006; No. 69, 2010 |
s. 53A................... | ad. No. 90, 2006 |
Part 6 |
|
Division 1 |
|
am. No. 90, 2006 | |
s 57.................... | am No 90, 2006; No 39, 2024 |
s 58.................... | am No 90, 2006 |
s 60.................... | am No 39, 2024 |
s 61.................... | am No 39, 2024 |
s. 62.................... | am. No. 90, 2006 |
s. 65.................... | am. No. 90, 2006 |
Division 2 |
|
s 66.................... | am No 90, 2006; No 78, 2009; No 69, 2010; No 90, 2015; No 39, 2024 |
Part 7 |
|
Part 7 heading............. | rs. No. 90, 2006 |
Division 1 |
|
s. 67.................... | rs. No. 69, 2010 |
s. 68.................... | am. No. 90, 2006 |
s. 70.................... | rs. No. 90, 2006 |
s. 72.................... | am. No. 69, 2010 |
Division 2 |
|
Subdivision A |
|
s. 73.................... | am. No. 69, 2010 |
Subdivision C |
|
s 81.................... | am No 90, 2006 |
s 82.................... | am No 90, 2006 |
Subdivision D |
|
am. No. 90, 2006 | |
Subdivision E |
|
s. 89.................... | am. No. 90, 2006 |
Part 8 |
|
Part 8 heading............. | rs. No. 69, 2010 |
am. No. 90, 2006; No. 69, 2010 | |
am. No. 69, 2010 | |
Part 9 |
|
s. 99.................... | am. No. 90, 2006 |
| rs. No. 69, 2010 |
s. 99A................... | ad. No. 69, 2010 |
s. 100................... | am. No. 90, 2006 |
s. 101................... | am. No. 90, 2006 |
s. 102................... | am. No. 90, 2006 |
s. 103................... | am. No. 90, 2006 |
Part 11 |
|
Division 2 |
|
s. 107................... | am. No. 90, 2006; No. 132, 2011 |
s 108................... | am No 74, 2023 |
s. 109................... | am. No. 90, 2006; No 4, 2016 |
Division 3 |
|
Subdivision A |
|
s. 110................... | am. No. 90, 2006 |
s. 111................... | am. No. 90, 2006; No. 69, 2010 |
Subdivision B |
|
s 112................... | am No 90, 2006 |
s 113................... | am No 90, 2006; No 4, 2016 |
ss. 114, 115............... | rep. No. 90, 2006 |
Division 4 |
|
am. No. 90, 2006 | |
Division 5 |
|
s. 124................... | am. No. 90, 2006; No 4, 2016 |
Division 6 |
|
s. 125................... | am. No. 90, 2006 |
Part 11A |
|
Part 11A................. | ad. No. 90, 2006 |
s. 125A.................. | ad. No. 90, 2006 |
s. 125B.................. | ad. No. 90, 2006 |
| am. No. 69, 2010 |
ad. No. 90, 2006 | |
Part 12 |
|
Part 12 heading............. | rs. No. 132, 2011 |
s. 126................... | am. No. 90, 2006 |
| rep. No. 132, 2011 |
s. 127................... | am. No. 90, 2006; No. 73, 2008 |
| rep. No. 132, 2011 |
s. 128................... | am. No. 90, 2006 |
| rep. No. 132, 2011 |
s. 129................... | am. No. 73, 2008 |
| rep. No. 132, 2011 |
s. 130................... | am. No. 90, 2006; No. 73, 2008 |
| rep. No. 132, 2011 |
s. 131................... | am. No. 73, 2008 |
| rep. No. 132, 2011 |
s. 132................... | am. No. 90, 2006; No. 73, 2008; No. 69, 2010; No. 89, 2011 |
| rep. No. 132, 2011 |
s. 133................... | rep. No. 132, 2011 |
s. 134................... | am. No. 90, 2006 |
| rs. No. 69, 2010 |
Part 13 |
|
Division 1 |
|
s. 135................... | am. No. 69, 2010 |
Division 2 |
|
s. 137................... | am. No. 8, 2010 |
Division 3 |
|
s. 138................... | am. No. 90, 2006; No. 78, 2009 |
s. 139................... | am. No. 8, 2010 |
Division 4 |
|
Division 4 heading.......... | rs. No. 69, 2010 |
s. 140................... | am. No. 90, 2006; No. 78, 2009; No. 69, 2010 |
s. 141................... | am. Nos. 8 and 69, 2010 |
Division 4A |
|
Division 4A............... | ad. No. 69, 2010 |
ad. No. 69, 2010 | |
Division 5 |
|
s. 141A.................. | am. No. 90, 2006; No. 78, 2009 |
s. 141B.................. | am. No. 8, 2010 |
Part 14.................. | rep. No. 132, 2011 |
ss. 142-146............... | rep. No. 132, 2011 |
s. 147................... | am. No. 90, 2006; No. 26, 2008; No. 58, 2011 |
| rep. No. 132, 2011 |
s. 147A.................. | ad. No. 90, 2006 |
| rep. No. 132, 2011 |
s. 148................... | am. No. 90, 2006; No. 46, 2011 |
| rep. No. 132, 2011 |
ss. 149-151............... | rep. No. 132, 2011 |
Part 15 |
|
Part 15 heading............. | rs. No. 90, 2006 |
ss. 152, 153............... | rep. No. 90, 2006 |
s 154................... | am No 90, 2006; No 69, 2010; No 4, 2016; No 41, 2018 |
Part 15A |
|
Part 15A................. | ad. No. 69, 2010 |
Division 1 |
|
s 154A.................. | ad No 69, 2010 |
| am No 13, 2013; No 31, 2014; No 13, 2021 |
s. 154B.................. | ad. No. 69, 2010 |
s. 154C.................. | ad. No. 69, 2010 |
s. 154D.................. | ad. No. 69, 2010 |
s. 154E.................. | ad. No. 69, 2010 |
s. 154F.................. | ad. No. 69, 2010 |
s. 154G.................. | ad. No. 69, 2010 |
s. 154H.................. | ad. No. 69, 2010 |
ad. No. 69, 2010 | |
Division 2 |
|
s. 154N.................. | ad. No. 69, 2010 |
s. 154P.................. | ad. No. 69, 2010 |
Part 15B |
|
Part 15B................. | ad. No. 69, 2010 |
Division 1 |
|
s 154Q.................. | ad No 69, 2010 |
s 154R.................. | ad No 69, 2010 |
Division 2 |
|
s. 154S.................. | ad. No. 69, 2010 |
Part 16 |
|
s 156................... | am No 69, 2010; No 132, 2011; No 67, 2018 |
s 158................... | rep No 132, 2011 |
s 159................... | am No 132, 2011 |
s 160................... | am No 90, 2006; No 78, 2009; No 69, 2010; No 90, 2015 |
s 160A.................. | ad No 69, 2010 |
| am No 126, 2015 |
s 160B.................. | ad No 69, 2010 |
s 161................... | am No 90, 2006 |
s 162................... | rs No 78, 2009; No 69, 2010; No 132, 2011 |
| rep No 90, 2015 |